9 Hunter St, Sydney, NSW

Located in the heart of the Sydney CBD, 9 Hunter St is a 17 level office tower with a multi-tenant profile situated above one of the city’s busiest food courts.

CORE was engaged in 2019 as part of plans to undertake a major refurbishment of the lobby area that would include upgrades and alterations to the commercial entry to the existing building, inclusion of a new accessible ramp, fire safety upgrades, shopfront and awning along with bespoke finishes to the foyer and lift lobby interiors such as the undulating ceiling, double-height glass façade and portal lighting.

The objective of the works was to enhance the environment and areas available for lease with cutting edge design, transforming the ground level of one of Sydney’s best situated office towers.

Timeline

6 months – design
12 months – construction

CORE – a partner of choice

As a multi-disciplinary consultancy, continuously adding value throughout the building’s lifecycle, CORE were well equipped to deliver an end-to-end project solution.

Over an 18-month period, our team in conjunction with our project partners delivered all major structural and building services works achieving significant aesthetic, functional, accessibility and safety improvements for tenants and staff alike.

Setting the building apart, one of the most impressive design features is the change from a single-height to a double-height facade which required the complete relocation of major services. Complemented by architecturally designed, undulating dowel with dowel and entry portal lighting designed by CORE, the lobby is the perfect example of design and functionality aligned.

Shoalhaven Hospital Multi-Deck Carpark, NSW

In a major milestone for communities of Shoalhaven and surrounds, Health Infrastructure recognised the need for additional car parking spaces to accommodate the growing use of Shoalhaven Hospital -improving connectivity and allowing easier and more convenient access for patients and visitors.

Timeline

12 months – design
12 months – construction

The Challenge: finding the best solution

Project Coordination engaged CORE for the demolition and development of the new multi-deck car park and security room.
The design stage was critical to ensuring the new car park capacity was optimised and would visually integrate and align with the hospital’s masterplan. Complex, existing issues on site needed to be overcome which saw CORE working closely with builders and clients to alleviate concerns safely and with timely and cost efficient solutions.

CORE’s key areas of focus were: capacity requirements, coordination with the existing helipad and impacts on helicopter approach to hospital, aesthetics, water diversion/flow path management, lighting and hydraulics.

The project was constructed within the challenging environment of an operating hospital and adjacent to a cancer care unit. Close collaboration and communication with stakeholders was required to ensure minimal interruption to clinical services and hospital access; as well as a focus on infection control due to the close proximity of immunocompromised patients.

The Outcome: car park capacity increased by over 50%

Construction on the NSW Government’s $11.8 million multi-storey car park was completed in June 2020.

The new five split-level car park provides patients and visitors with more than 300 new spaces, increasing the hospital’s overall parking capacity to over 550 spaces and features a stunning facade inspired by the colours and landscape art of Shoalhaven luminary Arthur Boyd.

Notably, the project was awarded Winner of the NSW MBA Building in Excellence Awards in the ‘Best Public Building $10-15M’ category.