Sydney Catholic & Anglican Schools

Delivering Integrated, People-First Solutions Across Multiple Educational Campuses

CORE has developed a strong and ongoing partnership with Sydney Catholic & Anglican Schools, delivering end-to-end engineering consultancy services across a number of primary and secondary education projects throughout Greater Sydney and regional New South Wales.

Our multi-disciplinary capabilities have supported the successful planning, design and delivery of projects at:

  • Holy Spirit Catholic College, Lakemba
  • St. Patrick’s Catholic Primary School, Mortlake
  • St Michael’s Catholic Primary School, Meadowbank
  • Shellharbour Anglican College

These projects reflect our ability to respond to the complex and evolving needs of educational environments, delivering tailored solutions that prioritise safety, efficiency, and long-term value for students, educators, and administrators alike.

Our scope of services across these campuses has included electrical, mechanical, hydraulic, fire, civil, structural, and facade engineering. Each site presented unique challenges – from site constraints in dense urban settings to integration with existing infrastructure and staged construction around live school environments.

Through close collaboration with architects, project managers, and Sydney Catholic Schools’ planning teams, CORE ensured that all building services were designed to meet modern educational standards while supporting sustainability objectives, operational efficiency, and ease of long-term maintenance.

Engineering Educational Spaces for Performance and Longevity…

Educational environments require a people-first approach that goes beyond technical delivery. Considerations around student wellbeing, acoustic comfort, natural ventilation, lighting, and safety are central to our design philosophy.

Our ability to deliver coordinated, in-house consultancy services means fewer handovers, faster issue resolution and a more unified outcome that aligns with the school’s vision and values.

Whether designing for new learning spaces, administration buildings, or upgrades to essential infrastructure, CORE consistently provides thoughtful, responsive engineering solutions that support the holistic development of school communities.

Nan Tien Temple – Berkeley, NSW

CORE was engaged to provide multi-disciplinary engineering consultancy services for a highly sensitive and culturally significant project at the Nan Tien Temple – Australia’s largest Buddhist temple, located in Berkeley, near Wollongong.

Our scope included electrical, mechanical, civil, fire, façade, and structural engineering services, all delivered in support of the integration of a new lift system within the temple’s existing structure.

This upgrade was intended to enhance accessibility for worshippers and visitors, while ensuring minimal disruption to the function and integrity of the temple.

Timeline: 6 weeks – design

Mindful Integration Within a Living Place of Worship

Given the spiritual and cultural importance of Nan Tien Temple, our design approach was deeply respectful and mindful of the environment we were working within.

Faith-based buildings demand not only technical expertise but also a nuanced understanding of how engineering interventions affect the daily operation, acoustics, atmosphere, and visual harmony of the space.

The addition of the lift required significant coordination across all disciplines – structural adaptations to accommodate the lift shaft, re-routing of mechanical and electrical systems, and careful integration of fire safety requirements – all while preserving the aesthetic and spiritual ambience of the temple.

The project was completed under a fast-tracked design timeline, with CORE delivering a comprehensive and coordinated design package in a matter of weeks. This quick turnaround was achieved through close collaboration between our in-house teams, allowing us to anticipate service clashes early and propose efficient, buildable solutions.

By taking a people-first engineering approach, we ensured that our designs supported not only the functional upgrade of the facility but also the comfort, dignity, and spiritual experience of its users – reinforcing our commitment to engineering with empathy and precision in spaces that serve communities.

ISKCON Temple – North Sydney, NSW

CORE recently completed the design phase for a unique and culturally significant engineering consultancy project: the redevelopment of the ISKCON Hindu Temple at 180 Falcon Street, North Sydney.

Engaged by Potentia Group and ISKCON, our team was responsible for delivering comprehensive building services, including electrical, Level 3 electrical design, mechanical, hydraulic, fire, and vertical transport.

The new temple is set to replace the existing structure, spanning four basement levels and four above-ground levels in a highly visible location at the intersection of Miller and Falcon Streets.

Timeline

Spatials/Concepts – 2 months

Design – 6 months

Construction – TBC

Collaborative Design for Spiritually Significant Spaces 

Working on a place of worship requires a thoughtful, collaborative approach that balances technical excellence with a deep respect for cultural and functional needs.

The Hindu temple presented unique challenges, particularly in ensuring that all services complemented the architectural vision and the sacred function of the space. For instance, the large, open-plan worship areas required innovative
ventilation solutions that preserved the spatial openness while achieving comfort and efficiency.

Our team designed a series of vertical risers extending to the roof level – an intensive process that involved iterative design coordination and detailed spatial planning. Over a two-month spatial and conceptual design phase, followed by
six months of detailed design, we worked closely with the project architect, a sustainability engineer, and the town planner to ensure full integration of all building systems.

This coordination was crucial in a development where aesthetics, spiritual significance, and community use had to be sensitively considered alongside compliance and technical performance. CORE’s capacity to deliver a full suite of services under one roof streamlined communication and enhanced the outcome for the client – ensuring that the final design is not only technically robust but also reflects the temple’s cultural importance and community role.

‘Anthem Care’ Residential Aged Care, Hornsby, NSW

CORE were initially contacted by Blissett Group to provide pre-engagement advice regarding a new residential aged care development in Hornsby. During this period, our team collaborated with both the Client as well as their preferred local and international suppliers to determine optimal construction methods.

Testament to our quality advice and having gained a strong understanding of Client objectives, CORE was formally engaged to deliver design services from concept to completion across all major disciplines: mechanical, electrical, fire, hydraulic, facades, structures.

Timeline

Our team is currently undergoing design for the 12-storey aged care facility with commercial tenants and assisted living units. We estimate a 6 – 9 month completion timeframe for design.

A Welcome Addition to Hornsby’s Community Hub

Located in the middle of the Pacific Highway and adjacent to Hornsby station and key community sites such as Hornsby Westfield, Anthem Care’s new facility is a welcome addition to Hornsby’s community hub.

This project is a great example of what CORE does best – showcasing our ability to deliver 360-degree engineering solutions via our in-house team of experts, providing seamless project coordination of multi-disciplinary services and all bolstered by exceptional communication.

CORE are committed to delivering on the Client’s vision, with superior engineering and Client experience at the helm of our offering.

Investa: NSW, VIC, QLD Portfolio

Our Partnership

CORE has delivered facade auditing and fire consulting services for Investa’s NSW, VIC and QLD portfolio of 21 assets for more than 10 years.

As Investa’s base building consultants, our team has gained an intimate knowledge of each building as well as a strong understanding of the operational and compliance excellence expected of Investa’s suppliers, along with their key drivers of success.

Achieving 100% Compliance with Inspection and Legislative Requirements, Codes and Authorities.

Working in close collaboration with the Investa management team, and in accordance with all state requirements, CORE has successfully delivered a national program of facade inspections and management of identified defects achieving and maintaining 100% compliance with Investa’s inspection requirements.

Our development and management of Investa’s fire compliance and certification process has seen CORE create a bespoke model that is well above industry standard and is reflective of the unique service requirements of Investa. This model continues to strengthen and evolve as we aim to deliver an efficient, sustainable and customised fire consulting services for Investa for years to come.

The People Behind the Buildings…

Paramount to our partnership’s success is CORE and Investa’s mutual commitment to effective communication and nurturing relationships throughout all streams of engagement.

With dedicated Site Managers and State Managers assigned to each location, CORE facilitates a personal, consistent and streamlined communication experience for both parties an approach that is supported by our operational processes and systems.

We understand the importance and value of clear, accountable communication flows and believe this to be one of the most critical components of what we deliver.

Experts in Existing Buildings.

Heavily integrated with other major disciplines, facades and building services play a significant role in determining the overall value, performance, safety and sustainability of a building.

CORE’s multi-disciplinary teamwork means we differentiate in facade excellence – delivering continuous improvement and setting new benchmarks in the industry.

More than 70% of CORE’s business is in existing buildings.

Our team are experts in this field – acutely aware of the challenges and constraints that arise throughout the building lifecycle and equipped to provide solutions that minimise tenant disruption whilst offering the safest, most efficient
and cost-effective outcomes.

It is our choice to only work with select clients to manage their premium building portfolios via our bespoke methodology and boutique client service. This approach enables us to deliver and uphold a high-quality, turn-key solution that
encompasses both technical engineering and project management practises seeing us take on all administrative, technical and cost analysis responsibilities so that our clients can focus on servicing their tenants.

Being at the forefront of the industry for compliance management – we’re always keeping commercial and regulatory requirements top of mind and working closely with clients to navigate and deliver in alignment with the ever-changing
compliance environment.

City of Sydney, NSW Portfolio

Our Partnership

Since 2019, CORE has been proudly appointed by MBM as City of Sydney’s partner of choice for the delivery of multi- disciplinary, technical engineering services across a portfolio of 125 assets.

An Array of Prominent, Flagship Locations that Shape the City of Sydney…

  • Town Halls
  • Aquatic Centres
  • Community Centres
  • Childcare Centres
  • Libraries
  • Leisure & Entertainment Venues
  • Commercial Offices
  • Industrial Warehouses

Experts in Existing Buildings, Delivering Turn-Key, Multi- Disciplinary Engineering Solutions.

Our dedicated CORE team are responsible for the provision of:

  • Technical due diligence investigations and reporting
  • Facade inspection services
  • Condition reporting
  • Feasibility studies
  • Design and specification
  • Construction services
  • Building safety upgrades
  • Fitouts / refurbishment projects
  • CAPEX projects
  • Certification

Leading with a ‘People-First’ Approach and an Unwavering Commitment to Operational Excellence.

Operating as a true extension to the City of Sydney team, CORE places a strong focus on the simultaneous delivery of high-quality engineering and exceptional customer service.

Working with a diverse group of stakeholders – from Facilities Managers, engineering and project management divisions, the sustainability team, through to tenants themselves, we pride ourselves on delivering a customised approach
and handling each interaction with care.

Communication, flexibility, a high level of responsiveness and the commitment to addressing priority items with urgency are integral to our approach.

Managing the unique, ever-changing requirements of each asset, City of Sydney’s diverse portfolio has required an intimate understanding of existing buildings and their lifecycle, along with experience in navigating the sensitivities
and intricacies of government requirements.

In addition to governance and regulatory obligations, historic value, cost and sustainability requirements, risk management and impact on end-users are always carefully considered to ensure the delivery of exceptional engineering
solutions and long-term value for our client.

As we continue our work with City of Sydney, we look forward to increasing our knowledge of their buildings and seeing them flourish within the community.

Next Practice Medical Centre, 20 Bridge St, Sydney, NSW

Next Practice Health aims to deliver a new level of healthcare, offering the very best in medical services and facilities in a modern, reimagined setting that has patient experience at the very heart of its vision.

With a mission to continually innovate the healthcare journey and extend services into Sydney’s CBD, Next Practice prepared to transform a prior office space at 20 Bridge St into what is now best described as a ‘clinic of the future’.

Timeline

8 weeks – design
10 months – construction

Engineering ‘Clinics of the Future’

Having strong experience in the Healthcare sector and in delivering high-end solutions for complex, live environments, CORE was engaged to deliver a 360 multi-disciplinary fitout solution that included the following engineering consultancy services:

  • Mechanical
  • Electrical
  • Hydraulic
  • Fire
  • Structural

Working closely with Next Practice to bring the client’s vision to reality, the CORE team engineered a meticulous combination of design and functionality for the space. Beyond a standard fitout, the project required several points of coordination and intrusion with base building services. Electrical requirements were unique for lighting and equipment specification for mechanical services was critical to achieving the client’s clinical ‘consulting pod’ concept.

Paramount to the project’s success, our team’s strong level of coordination, exceptional attention to detail and focus on collaboration and communication with key stakeholders has positioned CORE as the preferred partner for Next Practice Health’s national portfolio of clinics.

Griffith Base Hospital Redevelopment, NSW

CORE was engaged by Project Coordination to support the delivery of NSW Health Infrastructure’s $10+ million upgrade to Griffith Hospital, NSW.

The project involved the construction of a new Ambulatory Care Hub as well as extensions to the hospital’s Critical Care and Inpatient Units to increase patient capacity, enhance service functionality and welcome the addition of new support areas.
The plan also required improvements to existing car park facilities along with other external works.

Timeline

6 months – design
12 months – construction

Our Approach: achieving a detailed understanding of the client’s needs

When working within the Health sector, dedicating the necessary time to listen and develop a strong understanding of a client’s needs is more critical than ever.

From the initial consultation stage, the CORE team ensured that the right amount of time was spent upfront in order to deliver a better long-term result.

As always, strong, open lines of communication played a key role in determining project success and saw CORE working alongside on-site teams as well as the hospital board to ensure proposed solutions aligned with the hospital’s operational requirements.

The Outcome: delivering optimal design, reducing time and costs

The redevelopment of Griffith Base Hospital was a multi-layered, complex project with a clear objective to significantly enhance the hospital precinct, its processes and operations.

CORE’s detailed and thorough approach to the project’s design phase was invaluable.

Our 3D modelling capabilities enabled key stakeholders to seamlessly visualise the proposed solutions and facilitated critical conversations during the early stages of the project – saving significant amounts of time and money during the construction phase.

The 12-month construction stage was delivered to scope, on time and to budget with the hospital remaining fully operational throughout the period.

Cooma Hospital Redevelopment, NSW

NSW Health Infrastructure were redeveloping the Cooma Hospital to deliver enhanced services, facilities and care to Cooma and surrounding communities.

With an investment of over $24 million, the project involved a staged extension and refurbishment of two adjacent blocks at the hospital campus. The upgrades saw the development of a new Maternity Ward as well as an expanded and improved Emergency Department and relocation of Ambulatory Care, Pathology and Medical Imaging.

The CORE advantage: collaborative and integrated solutions

Having strong experience in the Aged Care/Health sector, and in delivering solutions for complex, live environments, CORE was engaged to deliver a multi-disciplinary project solution that included the following services:

  • Structural
  • Civil
  • Mechanical
  • Electrical
  • Fire
  • Hydraulics

Working closely with Project Coordination over a 2-year design and construction period, CORE delivered flexible, cost-effective engineering for Cooma Hospital that required seamless communication and integration across all stakeholders and services – ensuring the best possible solutions and outcomes were achieved along the way.

Critically, the rollout of our strategies and services enabled Cooma Hospital to remain fully operational throughout the project period.

9 Hunter St, Sydney, NSW

Located in the heart of the Sydney CBD, 9 Hunter St is a 17 level office tower with a multi-tenant profile situated above one of the city’s busiest food courts.

CORE was engaged in 2019 as part of plans to undertake a major refurbishment of the lobby area that would include upgrades and alterations to the commercial entry to the existing building, inclusion of a new accessible ramp, fire safety upgrades, shopfront and awning along with bespoke finishes to the foyer and lift lobby interiors such as the undulating ceiling, double-height glass façade and portal lighting.

The objective of the works was to enhance the environment and areas available for lease with cutting edge design, transforming the ground level of one of Sydney’s best situated office towers.

Timeline

6 months – design
12 months – construction

CORE – a partner of choice

As a multi-disciplinary consultancy, continuously adding value throughout the building’s lifecycle, CORE were well equipped to deliver an end-to-end project solution.

Over an 18-month period, our team in conjunction with our project partners delivered all major structural and building services works achieving significant aesthetic, functional, accessibility and safety improvements for tenants and staff alike.

Setting the building apart, one of the most impressive design features is the change from a single-height to a double-height facade which required the complete relocation of major services. Complemented by architecturally designed, undulating dowel with dowel and entry portal lighting designed by CORE, the lobby is the perfect example of design and functionality aligned.